Project Type: Replacement of Bitzer Compressor
Industry: Marine / Passenger Vessel
Location: Greece
Services Provided: Provision Cooling
Project Overview
Global Air successfully executed a key provision cooling project involving the replacement of a Bitzer compressor on a marine vessel. The provision cooling system plays an essential role in maintaining safe and consistent temperatures for food storage and supply areas, making reliability and performance a top priority.
Our team began with a thorough assessment of the existing equipment to confirm the need for replacement and to identify any supporting system adjustments required. The old compressor was safely removed, and a new Bitzer unit was installed in accordance with best practices, manufacturer specifications, and marine industry standards.
Once installation was complete, the system was tested to ensure stable operation, correct refrigerant circulation, and optimal cooling performance across all provision spaces. The project was completed efficiently, minimizing downtime and ensuring the vessel could return to service without disruption to its supply operations.
With this upgrade, Global Air improved the system’s energy efficiency, enhanced reliability, and reduced the risk of unexpected failures—providing the vessel’s crew with a dependable, modern solution for their provision cooling needs.
Bitzer Compressor Gallery










